Watts Dead Level® D Pre-Sloped Trench Drain System with 6"(152) wide x 48"(1219) long (standard) ductile iron frame, UV stabilized talc-filled polypropylene channels with integral 4"(102) no hub bottom or end outlet(s). System shall be frame-anchored, with (specify) grating to suit DIN Class (specify) load rating. System to include frame connectors, grate lockdowns, and con­struction covers. Installation to be performed in accordance with manufacturer's installation instructions.

Wessels is America's leading supplier of custom & specialty tanks in Indianapolis, Carmel, Bloomington, Columbus, Evansville, Terre Haute, Lafayette, Ft. Wayne, South Bend, Indiana as well as Chicago, Quad Cities, Illinois, Des Moines, Iowa, Columbus, Cincinnati, Ohio, Detroit, Michigan, Louisville, Lexington, Kentucky, Minneapolis, St. Paul, Minnesota, Madison, Wisconsin, St. Louis, Missouri and other areas throughout the Midwest and the United States.

You can also download the Wessels Company phone apps or use you web-browser to access free-to-use sizing software by clicking “Size Your Tank Now”

First, let’s define each one of these components. Amount of fluid is the gallons of system volume. This can be obtained either from the system drawings or estimated based on the size of the trunk main of the system and the dimensions of the building. Often, an accurate way to acquire this number is to ask a chemical treatment professional. They can dilute a trace chemical in the system and then measure that dilution, which can be used to extrapolate the system size.

The maximum ending pressure is normally set by the “weakest link” of the system. For example, if a boiler, heat exchanger, and air handler have maximum pressures of 100, 150, and 75 psi, respectively, you may be tempted to think the air handler is that “weakest link”. If, however, the air handler is at the top of the piping system, the pressure of a 65 psi increase from 10 psi to 75 psi is allowable. The boiler, if located at ground level where the pressure is 45 PSI to start, can only experience a 55 psi increase before it reaches its maximum rated pressure. A good practice is to allow the maximum pressure to increase by 25 to 35 psi over the initial starting pressure. Consider an operator watching the cycle of the HVAC system; if they observe an increase from 45 psi to 100 psi, they may consider that an abnormally high-pressure swing. Observing a pressure from 45 to 70 PSI is deemed in the eye of most operators as normal, as it does not approach the equipment’s maximum pressure.

The starting and ending temperatures of the fluid depend on the type of system. For a heating system, the starting temperature is normally ambient, or 70 degrees Fahrenheit. The final temperature is typically your operating temperature, equal to the boiler set point. For a chilled water system, the starting temperature is normally the operating temperature or 30 to 40 degrees Fahrenheit. The final temperature of the chilled water system occurs if the system is allowed to go from operating temperature to ambient. The temperature used for tank sizing is typically 100 degrees Fahrenheit, which is the temperature of a very hot day for most areas.

The type of fluid being heated is normally water or a mix of glycol and water. The specific volume of glycol increases with temperature faster than that of water. The difference between the specific volume at the starting and ending temperatures dictates the percentage increase in volume of the fluid. It should be noted that the piping system will also increase in size as it is heated. ASHRAE sizing, and most manufacturers, use a net expansion factor that accounts for the change in specific volumes less the expansion of the piping.

EF is the expansion factor that equals the percentage difference of the starting and ending specific volume of the fluid, minus the volumetric expansion of the system piping. Expansion factor tables are available from most manufacturers to make this calculation more convenient.

Image

Watts Dead Level® D Pre-Sloped Trench Drain System with 6"(152) wide x 48"(1219) long (standard) ductile iron frame, UV stabilized talc-filled polypropylene channels with integral 4"(102) no hub bottom or end outlet(s). System shall be frame-anchored, with (specify) grating to suit DIN Class (specify) load rating. System to include frame connectors, grate lockdowns, and con­struction covers. Installation to be performed in accordance with manufacturer's installation instructions.

For product-specific approval information, please refer to the product’s specification sheet (see literature section above) or ask a Watts representative. For general information regarding any approval certification partners identified in the specification sheet, please visit our certification partners’ websites:

Once you know the tank volume (Tv) you need, you can cross-reference that number with the acceptance volume of expansion tanks in our PDF catalog or our online ordering catalog wesselsvessels.com

Image

The minimum starting pressure for the tank depends on the height of the building above the expansion tank location. Starting with a penthouse installation, the pressure of the piping in the top floor installation needs to be 10 psi to ensure proper purging of the air that can collect at high points in the system. This means that the expansion tank located in a penthouse would be set for that same pressure, or 10 psi. As the tank moves downward in the system, an increase of 1 psi is needed for every 2.3 feet from the top. If the tank moves down 80 feet from the top, an additional 80 feet/2.3 feet per psi, or 35 psi more is added. The resulting charge for the tank is 35 psi plus 10 psi (needed at the top) or 45 psi.

Image