Our audit teams are constantly conducting random checks to ensure the compliance that’s so vital to our ability to provide clean, safe drinking water.

Image

If you own a business, own a multi-dwelling such as a unit, or use an alternate water supply, you may be required to have a backflow prevention device installed on your property.

Similarly, if you own a multi-dwelling such as a unit, or you rely on an alternate water supply such as a bore or water re-use system, you will need to engage a plumber to determine your next steps.

Call 1800 245 090 any time if you notice a serious problem with power or water facilities. In an emergency call 000

A severe backflow incident can cause contaminants to enter our drinking water and may endanger a person’s health, or in extreme cases, a person’s life.

Construction of new power line, including clearing of vegetation will take place.Start: Monday 2 September 2024End: 30 November 2024Suburb: Lambells Lagoon and Middle PointStreets Affected:Arnhem HighwayAnzac ParadeThomsen Road

For example, consider a business owner cleaning a grease trap with a hose. Without the appropriate protection in place, a backflow event could cause the contaminated water from the grease trap to go back up the hose and mix into the water supply.

Image

This Manual applies to all Power and Water Corporation potable water supply systems licensed under the Water Supply and Sewerage Services Act  . Effective: 1 July 2009.

Cable replacement works will take place, from Thursday 12 September 8am to Saturday 30 November 4pm.We will advise when power interruptions are needed.

Our audit teams are constantly conducting random checks to ensure the compliance that’s so vital to our ability to provide clean, safe drinking water.

Should be completed by the certified licenced plumber and emailed to backflowprevention.pwc@powerwater.com.au when they have installed a backflow prevention device at a property.

Construction of new power line, including clearing of vegetation will take place.Start: Monday 2 September 2024End: 30 November 2024Suburb: Lambells Lagoon and Middle PointStreets Affected:Arnhem HighwayAnzac ParadeThomsen Road

The following list is to be used as a guide only. Only a backflow accredited plumber or water industry representative can determine your property’s hazard level.

Underground power cable upgrade works will take place.Start: Tuesday 6 August 2024End: 15 November 2024 Times: 8am – 5pm Monday - Friday 9am  – 4pm Saturdays Suburb: WanguriStreets Affected:Gsell StHenbury Avenue

It’s important because backflow – which can occur when there’s a sudden differential in water pressure – can result in contaminated water reversing out of a property’s water system and back into our drinking water supply.

A backflow accredited plumber will determine your hazard level, install a backflow prevention device if you need one, or complete the required annual testing if you already have one. Your plumber will then forward the details to Power and Water. We’ll keep a register of your device and advise in writing when it’s time for your next annual test.

Underground power cable upgrade works will take place.Start: Tuesday 6 August 2024End: 15 November 2024 Times: 8am – 5pm Monday - Friday 9am  – 4pm Saturdays Suburb: WanguriStreets Affected:Gsell StHenbury Avenue

If your property requires a backflow prevention device, there are a number of approved devices available. These include:

‘Medium’ and ‘high’ risk properties must have a backflow prevention device installed. Importantly, these devices must be tested every year to ensure they work.

Routine vegetation maintenance will be taking place around Alice Springs and the rural area. See additional information.

There are currently no outages in your area!

This can occur when there is a sudden differential in water pressure, such as when there is a break in a water main, when a large volume of water is pumped from the main during a fire, or when a property has a higher pressure than the water supply system.

Routine vegetation maintenance will be taking place around Alice Springs and the rural area. See additional information.

To determine whether your business or multi-dwelling is ‘at-risk’, you’ll need a backflow accredited plumber to assess your hazard level.

If you are a business owner, it is important that you engage a backflow accredited plumber as soon as possible to determine your property’s hazard level.

Backflow is the unwanted reverse flow of water from a property back into the water supply. In simple terms, used water that may be contaminated goes back into our drinking water and could end up in someone’s glass.

A backflow accredited plumber or qualified water industry representative will be able to determine which device is best suited to your property.

Ask our development experts about costs for development and subdivision. Also, ask for quotes on your development projects.

A key component to business attraction is adequate water and sewer service. The City of Columbus - the sole sanitary sewer service provider for Groveport and the primary water service provider for much of the area business parks - has indicated that it has ample capacity at both its water production and wastewater treatment facilities to accommodate the anticipated development of the Groveport area.

Trade waste is the liquid or liquid-borne waste generated from any industry, business, trade, manufacturing process or similar that is approved for discharge to sewer.

Image

These backflow events cause water that may be contaminated from common business or residential activities to be drawn back into the water supply.

Cable replacement works will take place, from Thursday 12 September 8am to Saturday 30 November 4pm.We will advise when power interruptions are needed.

We acknowledge Aboriginal and Torres Strait Islander peoples as the traditional custodians of this land and are committed to reconciliation among all Australians.

Underground power cable upgrade works will take place.Start: Monday 15 July 2024End: 31 October 2024 Times: 8am – 5pm Monday - Friday 9am  – 4pm SaturdaysSuburb: WanguriStreets Affected:

Underground power cable upgrade works will take place.Start: Monday 15 July 2024End: 31 October 2024 Times: 8am – 5pm Monday - Friday 9am  – 4pm SaturdaysSuburb: WanguriStreets Affected: