By the code and spec sheet, Alex has the answer already. However from a real-world standpoint I feel it would depend on if you are installing just the IBR and another contractor would be connecting to it and installing the remainder of the underground piping, or if you have ownership of the entire underground scope of work. If you only have partial ownership I'd put in a thrust block as insurance, since you have no control over what happens to the other side of the connection. The underground assembly requirements should be specified as either fully restrained, or requiring thrust-blocking at the bid document specification level. The allowable types of materials and fittings that can be used in each specific arrangement should then be specified. If you are the contractor and that isn't spelled out then I'd send an RFI, and if you're the designer/engineer then you need to decide which approach you are using first and then decide which products fit that approach. As a sprinkler contractor I always push back on project specifications that call for the sprinkler fitter to install 5' out of the building and have the civil contractor install the remainder of the underground piping. This division creates so many headaches from a documentation and commissioning standpoint, and there is no valid reason why the civil contractor can't install the last bit of pipe inside the building up to the aboveground flange. They are frequently also the foundation contractor so it's not like they aren't already involved with the project. If there are licensing or qualification issues with this, then frankly they probably shouldn't be installing any portion of the fire service line, or should be doing that scope under sub-contract to the qualified fire contractor. Splitting the scope creates problems with pressure testing, flushing, chlorination, restraint, and most importantly who is responsible for filling out and submitting the NFPA 24 completion certificate! It's well past time for this traditional spec book language to be updated. Sorry for the rant. This topic is a sore spot for me!

AmesWater

IBR-2

Image

I would provide the thrust block. Typical a non-restrained joint will be placed at the 5 foot connection point to the exterior water supply and just a flanged or groove connection just above the building floor. I do not consider either of these as being truly a restrained or fused joint.

All A1171 ABA ADA ASCE 7 ASME A17.1 ASTM E1354 Blog Thread Daily Discussion Design-documents EN 12845 Explosion Protection Explosion-protection-prevention Fire Detection And Alarm Systems Fire Dynamics Flammable And Combustible Liquids Flammable-combustible-liquids FM Global Human-behavior IBC ICC 500 IFC IMC IPC IRC ISO Means Of Egress NBC NFPA 1 NFPA 10 NFPA 101 NFPA 11 NFPA 110 NFPA 1142 NFPA 1221 NFPA 13 NFPA 13D NFPA 13R NFPA 14 NFPA 15 NFPA 16 NFPA 17A NFPA 20 NFPA 2001 NFPA 214 NFPA 22 NFPA 220 NFPA 24 NFPA 241 NFPA 25 NFPA 291 NFPA 30 NFPA 307 NFPA 30B NFPA 33 NFPA 400 NFPA 409 NFPA 415 NFPA 495 NFPA 497 NFPA 5000 NFPA 502 NFPA 54 NFPA 55 NFPA 654 NFPA 68 NFPA 70 NFPA 701 NFPA 72 NFPA 75 NFPA 770 NFPA 82 NFPA 855 NFPA 90A NFPA 92 NFPA 96 NICET OBC OSHA Passive Building Systems PE Prep Guide PE Prep Series PE Sample Problems Poll Smoke Management Special Hazard Systems UFC 3-600-01 UFC 4-021-01 UPC Updates Water Based Fire Suppression Weekly Exams

The IBR itself, is considered restrained since it meets the criteria set forth in NFPA 24 (2013) Section 10.8.1.1 which requires compliance with EITHER Section 10.8.2 - thrust blocks, OR 10.8.3 - restrained joint systems. The IBR is provided with a push-on inlet bell which includes welded tabs for rodding across this unrestrained joint in and of itself. Only then is this joint considered restrained per Sections 10.8.3(5) and 10.8.3.1. The upper end prep is either grooved or flanged which are both considered restrained per Sections 10.8.1.2 and 10.8.3(3) respectively. Therefore, additional restraint for the connections to THIS fitting are not required per Section 10.8.1.2. The issue is whether the UG piping upstream of the IBR is restrained or not. Theoretically, just one unrestrained joint in a straight run of pipe can result in separation under sufficient internal pipe pressure. Therefore, each straight run of UG pipe should be 'bookended' with thrust blocking to prevent separation at any joint in between if every joint in between is not KNOWN to be restrained in accordance with NFPA 24 Section 10.8. The owner may have additional requirements above and beyond the minimum set forth in NFPA 24 and cognizance of those requirements are recommended. What you do or don't do could have a detrimental effect on portions of the UG piping system that are not in your scope.

NO! We have put 100's of these in the ground over the last 30 years, none have come out of the ground. Don't try to overcode this because of lack of experience, don't worry about the rest of the UG line if you're not contracted to install it. Rod the IBR to the UG pipe. Not required by any code, stop trying to change it lol.

AmesIBR2

The underground to the building riser must be fully restrained to prevent separation along the push on joints. Nfpa 13,24. If you are unsure— say you didn’t install the underground, but were responsible for the last 5 feet, then install a thrust block. Common sense must prevail, you don’t want a system failure.

I agree with ALMOST everyone on this. If you are installing all of the fire line, then do what needs to be done to restrain it. Rod and/or thrust block. A little common sense goes a long way here. If you are only doing the 5' out, I would definitely rod AND thrust block. If the utility contractor fails to connect to your rods, then you still have the TB to at least keep your end from pushing out. Who knows how much abuse the run-in is going to see during concrete pour, site traffic, and the utility contractor when connecting. This applies to even the SS lead-ins in my book. Don't ever assume the utility contractor knows what they are doing.

Hi, NFPA 24 (2013) Section 10.8.1.2 states that fused or "welded joints shall not require additional restraining, provided that such joints can pass the hydrostatic test of 10.10.2.2 without shifting of piping or leakage in excess of permitted amounts" From the installation guide provided, it appears that the only time additional constraints will be required is when you are testing just the riser or riser/main connection (Page 3) Thanks, Alex

November 2024 October 2024 September 2024 August 2024 July 2024 June 2024 May 2024 April 2024 March 2024 February 2024 January 2024 December 2023 November 2023 October 2023 September 2023 August 2023 July 2023 June 2023 May 2023 April 2023 March 2023 February 2023 January 2023 December 2022 November 2022 October 2022 September 2022 August 2022 July 2022 June 2022 May 2022 April 2022 March 2022 February 2022 January 2022 December 2021 November 2021 October 2021 September 2021 August 2021 July 2021 June 2021 May 2021 April 2021 March 2021 February 2021 January 2021 December 2020 November 2020 October 2020 September 2020 August 2020 July 2020 June 2020 May 2020 April 2020 March 2020 February 2020 January 2020 December 2019 November 2019 October 2019 September 2019 August 2019 July 2019 June 2019 May 2019 April 2019 March 2019 February 2019 January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 November 2016 October 2016 July 2016 June 2016